| Project Name |
Description |
Duration |
Tools and Platforms |
Activity |
Team Size |
Effort Applied |
Remarks |
| Non Real Time
(NRT) testing of Air Data System for IV&V |
Software
Verification & Validation for IV & V :Project of Source code of Air Data system of
LCA FCS (Flight control system) with execution of Test cases on Target Environment and
Simulator written in Matlab code for Validation |
1 Year and 3
Months |
Ada on VAX /
VMS, Matlab / Simulink, Windows NT, ICC Cross compiler for I80960 Target Environment |
SRS, SDD
Analysis, Code analysis, CSC / CSU Testing with Software Testing using MIL 2167 Standards
and Documentation |
3 Nos. |
34 Manmonths |
For ADA |
| Development of
tests Software to test the IFCS at the Iron Bird Site |
Software
Configuration Management Activity using LTM tool on VMS Platform, To built some of the
User friendly Libraries for code Maintenance etc. |
1 Year |
VAX /VMS, LTM
Tool , Source codes using Ada, C etc., |
Building the
necessary programs using LTM tool for Software configuration Management, Version control
etc |
2 Nos. |
24 Manmonths |
For ADA |
| IFCS
simulation, Iron Bird software development and IV&V FCS Software |
Software
Configuration Management Activity using LTM tool on VMS Platform, To built some of the
User friendly Libraries for code Maintenance etc. |
1 Year |
VAX /VMS, LTM
Tool , Source codes using Ada, C etc., |
Building the
necessary programs using LTM tool for Software configuration Management, Version control
etc |
2 Nos. |
24 Manmonths |
For ADA |
| IV&V of LCA
FCS version 3.0 Software at ADA. |
Software
Verification & Validation activity , CSC / CSU Testing of Softwares of various
modules of LCA such as Control law, Launch computer, Mission computer, Actuator systems
etc., |
Ongoing for 2 ½
years |
Ada, C, on VAX
/ VMS Platform, Windows; Matlab / Simulink, Rational Rose, Testing tools such as
Logiscope, db960 etc., |
CSC / CSU
Testing of various modules for LCA FCS with Test Plan, design of test cases, Static and
Dynamic analysis etc., |
Ongoing for 2 ½
Years |
Ongoing since 2
½ years |
For ADA |
| IV&V
activities ADA work center |
Same as above |
Same as above |
Same as above |
Same as above |
Same as above |
Same as above |
For ADA |
| Development and
supply of Software Configuration Management package at Iron Bird |
Software
Configuration Management Activity using LTM tool on VMS Platform, To built some of the
User friendly Libraries for code Maintenance etc. |
Since 2 years |
VAX /VMS, LTM
Tool , Source codes using Ada, C etc., |
Building the
necessary programs using LTM tool for Software configuration Management, Version control
etc |
2 Nos. |
48 Manmonths |
For ADA |
| Software
manpower support for the development of LCA FCS OFP Software in ADA and 80960 MC assembly
language |
Development of
Software for LCA FCS various modules such as ADS, CLAW, Actuators, Panel software,
Embedded Software etc |
4 years |
Ada 83 and 95,
and C on VAX?VMS, HP-UX, Solaris; Matlab/ Simulink, logiscope, db960, ICC compiler for
i960 |
Development of
Software for LCA FCS various modules such as ADS, CLAW, Actuators, Panel software,
Embedded Software etc |
8 Nos. |
Above 350
manmonths |
For ADE |
| IV&V of ATE
LRU Tester Software. |
Software
Verification and Validation Project of LRU Tester software for Automated Test Equipment |
2 Years |
Software
testing of various device drivers in windows environment, win32, C on windows environment,
rational rose etc |
Software
Verification and Validation Project of LRU Tester software for Automated Test Equipment |
3 Nos. |
40 Manmonths |
For ASEIO |
| Maintenance of
Operational Flight Software of the Project DAWN |
Code
Maintenance and configuration Management with code modifications based on testing activity |
1Year |
VAX / VMS,
Windows, c, VC++ |
Code
Maintenance and configuration Management with code modifications based on testing activity |
2 Nos. |
24 Manmonths |
For ASEIO |
| Development of
Mission Planning Software MIPS-EW for the Project |
Code
development for MIPS Electronic warfare |
1 ½ year |
Windows, C,
VC++, MFC |
Development of
Software and Testing |
3 Nos. |
36 Manmonths |
For ASEIO |
| Development and
supply of Software Configuration Management package at Iron Bird. |
Downloading of
s/w builds and CHKSUM verification for code integrity. Configuration management of the
whole SDLC phases |
3 Years |
VAX/VMS, C,
VC++ |
|
2 Nos. |
72 manmonths |
For ADA-DFCC |
| Customized
Browser |
Development of
software for a Internet Browser customized for defence . |
3 Months |
Windows, Java,
JSP, HTML, JDK |
Development of
software for customized Web Browser |
2 Nos. |
6 Manmonths |
For CAIR |
| Customized
Proxy Server |
Development of
software for a Proxy Server for Defence |
3 months |
Windows, C,
Java, HTML, JDK |
Development of
software for a Internet Browser customized for defence . |
2 Nos. |
6 Manmonths |
For CAIR |
| Conversion of
Kaveri Engine Control Laws Fortran codes to C codes |
Porting of code
from fortran to C for 6 Modules for the Kaveri Engine model |
3 Months |
C, Windows
Platform, DOS, SRS, SDD prep. With 2167 Standard |
Development of
C code based on functionalities from fortran |
6 Nos. |
1 ½ year |
For GTRE |
| Model
Validation of KADECS |
Validation
of code output of fortran with C for 6 modules |
1
Month |
Validation
of results |
|
6
Nos. |
1 ½
year |
For
GTRE |
| Preparation of
test cases and test plan for verification of control law |
Software
testing of control laws using Mil 2167 standards, |
4 Months |
Software
testing as per 2167 standards |
Software
testing of control laws using Mil 2167 standards, |
6 Nos. |
1 ½ year |
For GTRE |
| Linear Design
of KADECS Controller |
Control design
and linear design for control loops |
3 Months |
Control design
and linear design for control loops |
Control design
and linear design for control loops |
6 Nos. |
1 ½ year |
For GTRE |
| Integrated Non
linear real time simulation for KAVERI Engine Control System |
Development of
Integrated simulation model and Testing on Integration model |
3 months |
Development of
Integrated simulation model and Testing on Integration model |
Development of
Integrated simulation model and Testing on Integration model |
6 Nos. |
1 ½ year |
For GTRE |
| Fuel Pump Test Plan Automation |
Development and Testing |
3 months |
Development and Testing |
C, Java, HTML |
2 Nos. |
6 Manmonths |
For MICO |